Home Knowledge Base Process Change Control (PCC)

Process Change Control (PCC) is the overarching quality management system framework that governs how all changes to the semiconductor manufacturing process — materials, methods, machines, and manpower (the 4M elements) — are proposed, evaluated, approved, implemented, verified, and documented — the meta-system that contains ECOs, ECNs, deviation permits, waivers, and requalification requirements within a single structured governance process that prevents unauthorized modifications from destabilizing billion-dollar production operations.

What Is Process Change Control?

Why PCC Matters

PCC Tier Classification

TierExamplesApprovalCustomer Notice
1 — CriticalNew material vendor, tool relocation, design rule changeChange Control Board + CustomerRequired (90+ days)
2 — MajorRecipe parameter outside qualified range, new tool qualificationCross-functional reviewCase-by-case
3 — MinorLike-for-like component swap, software patch, consumable lot changeEngineering approvalNot required
4 — AdministrativeDocument formatting, training material updatesQuality approvalNot required

Process Change Control is the anti-chaos framework — the rigorous governance system that channels engineering creativity through structured evaluation gates, ensuring that every "improvement" is validated before it touches production and every modification is traceable for the lifetime of the product.

process change controlproduction

Explore 500+ Semiconductor & AI Topics

From EUV lithography to CUDA optimization — search the full knowledge base or chat with our AI assistant.