Home Knowledge Base Timing Signoff

Timing Signoff is the final verification step that confirms all timing paths in the chip meet their setup, hold, and transition time requirements across all operating conditions — the last gate before tapeout authorization, where failure to close timing means the chip will either not function at the target frequency or produce incorrect results.

What Timing Signoff Checks

Signoff Corners

CornerVoltageTemperatureProcessChecks
Worst-case slow (SS)Low VHigh TSlowSetup (slow paths)
Worst-case fast (FF)High VLow TFastHold (fast paths)
Typical (TT)Nominal25°CTypicalNominal performance
Best-case fast (FF cold)High V-40°CFastHold (extreme)

Signoff Tools

Signoff Flow

1. Extract parasitics: StarRC or QRC extracts R and C from physical layout. 2. Run STA: PrimeTime/Tempus analyzes all paths across all corners. 3. Fix violations: ECO (Engineering Change Order) to fix failing paths — buffer insertion, cell resizing, routing changes. 4. Re-extract and re-analyze: Iterate until all violations closed. 5. Generate reports: WNS (worst negative slack), TNS (total negative slack), max transition violations. 6. Signoff review: Lead engineer reviews reports and authorizes tapeout.

Signoff Criteria

Timing signoff is the most critical pre-tapeout verification step — a missed timing violation that reaches silicon means the chip either fails to meet its frequency target (reducing market value) or produces incorrect computations (requiring a mask respin costing $10-50M+).

timing signoffsignoff analysismulti voltage timingtiming signoff flowchip signoff

Explore 500+ Semiconductor & AI Topics

From EUV lithography to CUDA optimization — search the full knowledge base or chat with our AI assistant.