**Floorplan Constraints** are the **rules and guidelines that govern the placement of major functional blocks within the chip boundary** — determining macro placement, power domain boundaries, IO placement, and routing channel allocation before detailed cell placement begins.
**Floorplan Elements**
- **Die boundary**: Total chip dimensions determined by target area and package constraints.
- **Core area**: Active logic area inside die — surrounded by IO ring.
- **Power domains**: Separate voltage islands for power gating (MTCMOS blocks).
- **Hard macros**: SRAMs, embedded memories, analog blocks — fixed size, must be placed first.
- **Soft macros**: Hierarchical logic blocks — can be resized during implementation.
- **IO pad placement**: Input/output pads arranged around core perimeter.
**Hard Macro Placement Rules**
- **Alignment**: Macros must align to site grid (typically 2x standard cell height).
- **Abutment**: Memory banks often abutted for shared power rails.
- **Orientation**: SRAMs have preferred orientation for bit-line timing.
- **Channel width**: Minimum routing channel between macros — prevent congestion chokepoint.
- Rule: ≥ 10μm channel for M1–M4; ≥ 20μm for full routing clearance.
- **Halo (keepout)**: Buffer zone around macro where standard cells cannot be placed — prevents timing and DRC issues at macro boundary.
**Floorplan Quality Metrics**
- **Utilization**: Total standard cell area / core area. Target: 60–75%.
- > 80%: Routing congestion risk.
- < 50%: Wasted area, longer wires, higher power.
- **Aspect ratio**: Width/height. Target: 0.8–1.3 (near square). Extreme AR → long power/clock distribution.
- **Macro channel congestion**: Verify routing resource between macros before proceeding.
**Power Domain Constraints**
- Separate voltage rails for each power domain.
- Level shifter and isolation cell placement at domain boundaries.
- Power switches (MTCMOS) placed at power domain boundary rows.
Floorplanning is **the most impactful decision in physical design** — a poor floorplan creates timing, congestion, and power problems that cannot be fixed downstream, while a well-planned floorplan makes every subsequent step smoother and faster to close.