installed capacity

Installed capacity is the **maximum number of wafers a fab can process per month** when running all equipment at full utilization with optimal scheduling. It represents the fab's theoretical production ceiling. **How Capacity Is Determined** Capacity is set by the **bottleneck tool group**—the process step with the least throughput relative to demand. Even if all other steps have excess capacity, the bottleneck limits total fab output. Common bottlenecks include lithography (most expensive tools, longest process times at advanced nodes) and etch/deposition for complex multi-patterning flows. **Capacity Metrics** • **Nameplate capacity**: Theoretical maximum based on equipment count and throughput specs • **Effective capacity**: Realistic maximum accounting for PM downtime, qualification, and engineering holds (~85-90% of nameplate) • **Demonstrated capacity**: Highest monthly output actually achieved **Expanding Capacity** **Add tools at bottleneck** (quickest method—buy more scanners, etchers, etc.). **Increase tool throughput** (shorter process times, reduced PM frequency, faster wafer handling). **Improve utilization** (better scheduling, faster PM recovery, reduced engineering holds). **Build new fab** (takes 2-3 years and $5-20+ billion—last resort for major expansions). **Industry Capacity** Global installed capacity in 2024 exceeded **30 million 300mm-equivalent wafers per month**. TSMC alone represents approximately **15-17 million** WSPM. The industry added significant capacity after the 2020-2022 chip shortage, with new fabs from TSMC, Samsung, Intel, and others coming online through 2025-2027.

Go deeper with CFSGPT

Get AI-powered deep-dives, save terms, and run advanced simulations — free account.

Create Free Account