Reticle Contamination Inspection System
A reticle contamination inspection system checks the photomask itself for particles and residue before it gets loaded into a lithography scanner, because a single particle on a reticle doesn't just damage one exposure — it prints onto every single wafer field that reticle exposes until someone catches it and the reticle is cleaned or requalified.
A particle on a reticle multiplies its damage across every wafer field it exposes, which is exactly why reticle inspection runs on its own strict schedule separate from wafer inspection. A particle on an individual wafer affects that one wafer; a particle on a reticle gets projected into the pattern every single time that reticle exposes a field, printing the same defect repeatedly across every wafer run through the scanner until the problem is caught — a far more expensive failure to let slip through than any single-wafer contamination event, which is why reticles get inspected on a tight, proactive schedule rather than only when a downstream wafer defect is traced back to one.
Pellicle protection changes what reticle contamination inspection is actually looking for, since a pellicle moves the particle's focal plane away from the pattern itself. A pellicle is a thin, transparent membrane mounted a fixed distance above the reticle's patterned surface specifically so that any particle landing on the pellicle sits out of the scanner's focal plane and doesn't print sharply onto the wafer; reticle inspection still has to check both the pellicle and the patterned surface underneath, since a defect on the pattern side has no such protection and will print regardless of whether the pellicle is clean.
Reticle contamination inspection exists because the economics of a defect multiply differently here than almost anywhere else in the fab — one uncaught particle on a reticle doesn't cost one wafer, it costs every wafer exposed with that reticle until the contamination is found, which is exactly why this inspection step runs on its own tight, proactive schedule.