Semi E114
SEMI E114 specifies the test methods and acceptance criteria for RF cable assemblies used in semiconductor process equipment — the actual insertion-loss, VSWR, and shielding-integrity measurements a cable has to pass before it's qualified for service in an RF power-delivery path — rather than the system-level power-accuracy and grounding requirements E113 defines for the delivery path as a whole. E113 says the delivered power at the electrode has to stay within tolerance and the path has to meet leakage-safety requirements, but it doesn't specify how to actually test one individual cable assembly to confirm it isn't the component silently eating that tolerance margin — E114 is the component-level test standard that lets a fab or cable vendor verify a specific cable assembly before it ever gets installed in an E113-qualified system.
The reason E114 needed to exist separately from E113 is that a system-level power-delivery spec tells an engineer the symptom to watch for — delivered power drifting out of tolerance — but not which of several components in the path caused it, and without a standardized component test, a worn or damaged cable can sit in service for months degrading delivered power in a way that looks like drift rather than a clear component failure. E114 closes that diagnostic gap: by giving cable assemblies their own defined test procedure and acceptance criteria, it lets a fab or cable vendor isolate and qualify the cable itself as a known-good or known-bad component, rather than troubleshooting an entire E113-compliant RF path from scratch every time delivered power looks off.
E114 is the standard that turns "delivered power is out of tolerance somewhere in the E113 path" into a quick, isolatable check: a fab can pull a suspect cable, run it against E114's defined test methods, and know definitively whether that specific cable assembly is the problem before spending time troubleshooting the rest of the RF system.