Semi E171.1
SEMI E171.1 specifies the SECS-II protocol binding for Predictive Carrier Logistics (PCL) — the actual message set that carries E171's congestion forecasts and rescheduling recommendations between equipment and host, following the same split this glossary has already seen between a GEM-based concept standard and its SECS-II transport companion, like E39/E39.1 for object services or E170/E170.1 for SFORMS. E171 defines what a congestion forecast is and what a host can know about it conceptually; E171.1 defines the specific SECS-II stream/function messages that actually carry that forecast, and any resulting reroute recommendation, over the wire between host and equipment.
A few things are worth knowing about why PCL needed this protocol-level companion standard in addition to E171 itself:
Every GEM-based concept standard in this glossary's SECS/GEM family eventually needs a wire-format companion, because SECS-II is the actual transport layer underneath all of them, and "SECS-II support" is never automatic just because a concept standard exists. E39 defined object services conceptually; E39.1 defined the SECS-II messages that carry object-service data. E170 defined SFORMS's access-control model conceptually; E170.1 defined its SECS-II messages. E171 follows the identical pattern: equipment projecting "stocker bay 3 will be congested in sixty seconds, recommend rerouting carriers 7 and 12" conceptually still can't deliver that forecast to a host, or receive the host's rescheduling decision back, without an agreed message format — and E171.1 is that message format for exactly this forecast-and-response exchange.
The specific messages E171.1 defines matter because a congestion forecast is only useful if it arrives with enough time left in its confidence window for a host to actually act on it, and an ad hoc, vendor-specific reporting channel introduces exactly the kind of latency and translation delay that erodes that window. E171 can define that a forecast carries a projected congestion location and a time-to-onset estimate, but if each AMHS vendor reports that forecast through its own proprietary interface, a host managing mixed equipment needs a separate integration for every vendor just to receive the warning in time to reroute — and by the time that translation happens, the sixty-second window PCL exists to exploit may already be gone. E171.1's stream/function definitions give every compliant tool the same wire-level vocabulary for the forecast and the host's response, so the message itself never becomes the bottleneck.
E171.1 sits alongside E39.1 and E170.1 as part of a now-familiar pattern this glossary has tracked across the GEM standard family — a concept standard defines a model, and a numbered .1 companion defines the SECS-II messages that make that model actually interoperable. Where E171 is the forecasting and rescheduling policy, E171.1 is narrower and purely mechanical: it's the agreed message format that lets any SECS-II-capable host receive a PCL forecast and respond with a rescheduling decision without vendor-specific integration work.
Read E171.1 as the standard that closes the gap E171 alone leaves open: a congestion forecast is only as useful as the speed and uniformity of the channel carrying it, and E171.1 is what actually gives PCL's forecasts and reroute recommendations a vendor-neutral SECS-II message format to travel in before the congestion window closes.