short-term capability
**Short-term capability** is the **estimate of process potential over a limited, controlled time window with minimal drift influence** - it is useful for machine acceptance and rapid diagnostics, but should not be mistaken for lifetime process behavior.
**What Is Short-term capability?**
- **Definition**: Capability computed from within-subgroup variation over closely timed runs.
- **Common Metrics**: Cp and Cpk based on short-window sigma estimates.
- **Data Characteristics**: Back-to-back samples with stable settings, often from one tool state.
- **Limitation**: Does not fully include long-term shifts from wear, environment, or operator changes.
**Why Short-term capability Matters**
- **Commissioning Use**: Provides rapid evidence that equipment can achieve required precision under controlled conditions.
- **Debug Speed**: Helps isolate intrinsic process noise before long-term drift confounds analysis.
- **Benchmarking**: Useful baseline for comparing tools or recipe alternatives.
- **Control Design**: Short-term sigma informs initial control-limit and guardband setup.
- **Gap Diagnosis**: Comparing short-term and long-term indices reveals hidden stability problems.
**How It Is Used in Practice**
- **Controlled Sampling**: Collect consecutive production or qualification runs under fixed conditions.
- **Index Analysis**: Compute Cp and Cpk with clear subgroup logic and measurement-system validation.
- **Follow-On Check**: Pair with long-term Ppk analysis before making release-level capability claims.
Short-term capability is **an important but partial quality metric** - it shows what the process can do in a sprint, not necessarily what it will do over a season.