Surface Barrier 1953 Inspect the Completed Assembly
Inspect the Completed Assembly: Two Risks Between Leads, Not One
Every concern this process has addressed since step eleven was about getting something right inside the device — alignment, timing, contact formation, bonding budgets. This inspection checks something categorically different: whether the two finished leads, now routed out of an assembly built around a membrane only a few micrometers thick, are safe both electrically and mechanically now that the device is complete. A device that passed step twenty-one's gain measurement can still fail this inspection in either of two independent ways this process has never had to check together before.
1. Lead Separation Still Has to Hold Off the Device's Own Operating Voltage
As in every earlier device this project has documented, the air gap between the emitter and collector leads sustains a voltage roughly proportional to its own length, scaled by air's dielectric strength $E_{\text{air}}$. A lead separation adequate for a bench continuity check can still be inadequate once the device is biased at its full rated collector voltage — identical physics to every prior series' $\text{lead-clearance}$ concern, unaffected by anything specific to $\text{jet-etching}$ or electroplating.
2. Real Diagram: Electrical Clearance Is Only Half of What This Step Checks
3. A Lead Routed Across the Membrane Reintroduces Step Sixteen's Fracture Limit
A lead's own tension $T_{\text{lead}}$, if routed at an angle $\theta_{\text{lead}}$ that carries any component of force across the membrane rather than purely along the rigid frame surrounding it, reintroduces exactly the $\text{fracture-stress}$ limit step sixteen's rinse procedure was built to respect — except now the stress source is permanent mechanical routing rather than a transient rinse jet. This is the check no $\text{bulk-wafer}$ device in this project's histories has ever needed, because no earlier device's finished geometry included a membrane thin enough for its own leads to threaten it after assembly is otherwise complete.
Inspect the Completed Assembly's Place in the Process Lineage
Inspecting the completed assembly is step $\text{twenty-two}$ of Philco's $\text{surface-barrier}$ process, immediately after the contacted element has been checked for gain and before the device is encapsulated. It carries forward the $\text{lead-clearance}$ check this project's earlier series already established, and adds a second check unique to this device's own geometry: confirming that neither lead's physical routing places tension across the membrane that could crack it after assembly is otherwise finished. Step $\text{twenty-three}$, encapsulating the device, is the step that permanently locks in whatever this inspection confirms or fails to catch.