chip tapeout checklist

**Tapeout Signoff** is the **comprehensive verification process completed before submitting chip layout data (GDS/OASIS) to the foundry for mask making** — the final gate that ensures the chip is functionally correct, physically clean, and manufacturable. **What Is Tapeout?** - "Tapeout" name: From the era when layout data was submitted on magnetic tape. - Modern: GDS2 or OASIS file containing all mask layers submitted to foundry via secure server. - Wafers manufactured 12–16 weeks after tapeout. - Errors discovered after tapeout → metal ECO spin (expensive) or full respin. **Tapeout Signoff Checklist** **Physical Verification**: - DRC (Design Rule Check): 0 violations on all layers (Mentor Calibre, Synopsys IC Validator). - LVS (Layout vs. Schematic): Layout matches schematic 100%. - ERC (Electrical Rule Check): Floating nodes, antenna violations = 0. - Density: Metal density per layer within foundry spec. - Fill: All layers have required dummy fill inserted. **Timing Signoff**: - STA: WNS ≥ 0, TNS = 0 at all PVT corners (SS, TT, FF) and all modes. - OCV/AOCV applied, SI effects (crosstalk) included. - Hold timing clean at all corners. **Power and Reliability**: - IR drop: < 5–10% of VDD at worst case. - EM: All wires within current density limits for 10-year life. - EMIR report approved by power team. **Functional Verification**: - Formal equivalence: Post-layout netlist matches pre-layout. - GLS (Gate-Level Simulation): Key test cases pass with back-annotated delays. - DFT: Scan chain connectivity verified, ATPG fault coverage target met. **Documentation**: - GDS hierarchy verified: All cells resolved, no missing references. - Technology file version confirmed with foundry. - IP licensing: All third-party IP blocks cleared for tapeout. - Export compliance: EAR99 or applicable export control documentation. **Post-Tapeout Immediate Actions** - Archive full database: GDS, DEF, timing databases, sim databases. - Freeze design: No changes after tapeout (unless wafers not yet started). - Begin test program development: ATE programming starts. Tapeout signoff is **the culmination of months or years of engineering work** — every checklist item represents a potential failure mode that has been systematically eliminated, and the rigor of the signoff process directly determines first-silicon success probability.

Go deeper with CFSGPT

Get AI-powered deep-dives, save terms, and run advanced simulations — free account.

Create Free Account