physical verification signoff
**Physical Verification Signoff** — the comprehensive set of checks that must all pass before a chip design is approved for manufacturing (tapeout), ensuring the layout is correct and manufacturable.
**Mandatory Signoff Checks**
- **DRC (Design Rule Check)**: All layout geometries comply with foundry rules. Must be 100% clean
- **LVS (Layout vs. Schematic)**: Physical layout matches intended circuit. Must be 100% clean
- **ERC (Electrical Rule Check)**: No floating gates, shorted supplies, missing connections
- **Antenna check**: No charge accumulation during manufacturing that could damage gate oxides
- **Metal density check**: All layers within min/max density for CMP uniformity
**Timing Signoff**
- **STA (Static Timing Analysis)**: All paths meet setup and hold timing across all PVT corners (may be 50+ corners)
- **SI (Signal Integrity)**: Crosstalk effects don't cause timing or functional failures
- **IR drop**: Voltage drop within acceptable limits everywhere on chip
**Reliability Signoff**
- **EM (Electromigration)**: All wires and vias within current density limits for expected chip lifetime
- **ESD**: Complete discharge paths verified for all pins
**Power Signoff**
- Power estimation at target workloads within thermal budget
- Power-up/power-down sequences verified
**Tapeout is a gate** — all signoff checks must pass with zero waivers for critical violations. A single missed check can result in non-functional silicon worth millions in wasted masks and months of delay.