final test yield
**Final test yield** is the **percentage of packaged devices passing comprehensive electrical and functional testing** — the last quality gate before shipment, typically 95-99%, with failures indicating assembly defects, latent manufacturing issues, or marginal devices caught by thorough testing.
**What Is Final Test Yield?**
- **Definition**: (Passing devices / Total tested) × 100% at final test.
- **Timing**: After packaging, before shipment.
- **Typical**: 95-99% for mature products.
- **Purpose**: Last chance to catch defects before customer.
**Why Final Test Matters**
- **Quality Gate**: Prevents defective products from shipping.
- **Assembly Defects**: Catches packaging-induced failures.
- **Comprehensive**: Most thorough test in manufacturing flow.
- **Customer Protection**: Last defense against escapes.
**Test Coverage**
- **Functional**: All operating modes and features.
- **Parametric**: Speed, voltage, current, power.
- **AC/DC**: Timing and electrical characteristics.
- **Burn-in**: Extended stress for high-reliability products.
**Failure Analysis**: Final test failures analyzed to improve wafer probe, assembly, or test coverage.
Final test yield is **the last quality checkpoint** — comprehensive testing that protects customers while providing feedback to improve upstream processes.